The project involved working with chief architect to desing the workshop and the place where the dynamometer was to be installed, considerating air flows that would keep the engine running safe, as well as allowing exhaust gases flowing outside the shop.
Choosing the equipment, installation and start up were done working jointly with local office of MAHA, provider of the dynamometer